Service Penetrations
Count pipes, cables, ducts and other services that pass through walls and floors. Record service type, size and substrate where shown.
Independent estimating · New Zealand
A measured scope your tender team can check against the drawings. Estivio provides independent passive fire take-offs for main contractors, builders, PQSs and subcontractors across New Zealand.
Count pipes, cables, ducts and other services that pass through walls and floors. Record service type, size and substrate where shown.
Measure linear items such as head-of-wall joints and perimeter seals by location and drawing detail.
Flag missing information, discrepancies and assumptions that could affect your tender quantities.
Match the symbols on an anonymised extract of a marked-up hydraulic drawing to the BOQ below.
| Service | Size | Substrate | FRR | Quantity | Unit | Notes |
|---|---|---|---|---|---|---|
| PVC Pipe | 32 mm | Concrete slab | -/90/90 | 3 | ea. | HY-EX-01 |
| PVC Pipe | 65 mm | Concrete slab | -/90/90 | 4 | ea. | HY-EX-01 |
| PVC Pipe | 80 mm | Concrete slab | -/90/90 | 2 | ea. | HY-EX-01 |
| PVC Pipe (FWG/SH) | 75 mm | Concrete slab | -/90/90 | 2 | ea. | HY-EX-01 |
| PVC Pipe (SW) | 125 mm | Concrete slab | -/90/90 | 2 | ea. | HY-EX-01 |
| PVC Pipe | 90 mm | Rated plasterboard wall | -/45/45 | 1 | ea. | HY-EX-01 |
The legend uses the source plan’s symbols and service categories. Sizes, fire resistance ratings (FRR), quantities and the drawing reference are illustrative.