Independent estimating · New Zealand

Intumescent Coating Estimating for Structural Steel

Give your tender team a measured steelwork schedule organised by member, location and the fire resistance requirements shown in the project documents. Estivio supports applicators and construction teams across New Zealand.

What You Receive

  • Editable steelwork quantity schedule and BOQ
  • Marked-up drawings tied to member references
  • Project report with assumptions and scope queries

What We Schedule

Steel Members

Identify the beams, columns and other steel members in scope. Record member references, locations and measured lengths or areas where the drawings support them.

Coating Scope

Group items by location and documented fire resistance requirements so your tender team can review and price each part of the package.

Tender Clarifications

Record drawing or specification gaps, agreed measurement assumptions and scope items that need confirmation.

Documents To Provide

Send the latest information you have and note any tender addenda you expect. We’ll agree the scope and flag any assumptions.

  • Structural drawings, steel schedules and relevant details
  • Fire report with the applicable fire resistance requirements
  • Intumescent coating specifications and scope information
  • Relevant architectural drawings and tender addenda